Initial situation - in an existing shopping center built in 2008, it is planned to reconstruct part of the 2nd floor into a food court and strengthen the ceiling for new equipment. There are scattered sources - architectural plans in DWG, scans of old as-built diagrams in PDF, measurement results of individual zones (spot dimensions), as well as a model of existing engineering systems in IFC of low quality (many errors in marks). It is necessary to collect an up-to-date coordination BIM model of the existing state and issue a set of data for design and procurement. Technical environment and subject area - Revit 2021-2024 (or compatible), Navisworks Manage for clashes, source formats DWG/PDF/IFC, units - mm, coordinate system - local site. The structure is monolithic/prefabricated sections, there are openings and mortgages of unknown origin, some of the work is being carried out without stopping the tenants. What needs to be done in stages 1) Preparation and normalization of source data - collate DWG, link and calibrate PDF scans, assess IFC quality, set up general levels/axes/coordinates, record assumptions and a list of questions for ambiguous areas. 2) Creation of a BIM model of the existing state of the reconstruction zone - floors, beams/transoms (if readable), columns, main walls/shafts, technological openings and openings, plus simplified tracing of key utility lines that affect reinforcement (large air ducts, trays, risers). Detailing - LOD 300 for architecture/structural and LOD 300 for large engineering elements, critical nodes - LOD 350 (joints, places of reinforcement, intersections with engineering). 3) Checking collisions and coordination - perform clash detection in Navisworks between the structure, architecture and utility lines. Issue a report with prioritization (critical/medium/low) and proposals for elimination (transfer of the route, adjustment of elevations, change in reinforcement dimensions) without reworking the entire project. 4) Release of measurable results - a statement of volumes/areas for floors and reinforcements (in Excel format), a list of holes/openings with coordinates and dimensions, a sheet with general views and sections (PDF), as well as a final set of models (RVT + IFC + NWD/NWF). Restrictions - Work according to available data without visiting the site. All unknown places should be documented as assumptions with a level of confidence marked. - The model should be lightweight - RVT size no more than 300 MB, without redundant high-detail families. - You cannot change the original local coordinate system - the binding is needed for the subsequent landing of the reinforcement project. - Completion period: 10 calendar days from the date of transfer of the source code, with intermediate delivery on the 4th day. Acceptance criteria (measurable) - At least 95% of the elements of the reconstruction zone have correct levels and marks (checked by selective verification of 30 control points from measurements/drawings). - The collision report contains at least 1 NWD/NWF and an Excel table with collision ID, participants, coordinate, screenshot and status. - The list of volumes is exported to Excel and coincides with the model (the discrepancy in the floor area is no more than 2% when recalculated). - IFC opens in Solibri/any viewer without losing the categories of the main elements (floors/columns/walls/ducts). Input data from the customer - DWG (plans/sections), PDF (scans), IFC engineering, table with measurements (if available), photos of individual zones, list of rooms in the reconstruction zone and work boundaries. The result is a coordination model of the existing state, a collision report and statements suitable for transmission to the reinforcement designer and subcontractors.